Client: Sonny’s Bar, Kingston
Project: Full Electrical Rewire, Compliance Upgrades & Lighting/CCTV Install
Completion Timeframe: 6 Days
A Summer Deadline, A High-Stakes Rewire
When the call came in from Sonny’s Bar in Kingston, it was clear this wasn’t going to be a standard job.
With an ambitious opening schedule and other contractors unable to deliver in time for peak summer trading season, or find a team capable of rewiring the entire premises, installing kitchen and bar supply systems, designing outdoor lighting, and completing a full CCTV/security overhaul — all in under a week.
We stepped in.



Scope of Emergency Works
With just six days before the bar’s planned summer reopening, we mobilised quickly. Our team assessed, planned, and executed a full electrical overhaul, covering:
- Complete electrical rewire
- Kitchen & bar power supplies (regulation compliant)
- Outdoor heating & lighting systems
- Emergency lighting upgrades
- CCTV installation with full networking
- Compliance documentation for local licensing approval
DAY-BY-DAY TIMELINE
Day 1 – Strip Out & Survey
- Immediate site survey
- Isolated all unsafe circuits
- Stripped existing non-compliant wiring
- Drafted new circuit layouts overnight
Day 2–3 – Rewire & Distribution
- Installed new cabling throughout bar, kitchen, cellar, and outdoor areas
- New RCBO boards and submains fitted
- Containment installed and labelled
Day 4 – Kitchen, Bar & Power
- Connected and tested dedicated supplies for:
- Ovens, refrigeration, glass washers, coffee machines
- Installed IP-rated isolators and switched spurs
Day 5 – Outdoor & Decorative Lighting
- Designed and installed festoon lighting, wall washers, and uplighters
- Installed outdoor infrared heating (with timers and thermostats)
- Set up dusk-to-dawn controls and override options
Day 6 – Security & Compliance
- Deployed and tested 13-camera HD IP CCTV system, networked to central NVR
- Emergency lighting and illuminated exit signs installed and tested
- Final fix and commissioning
- Full testing & NICEIC certification ready for submission
PROJECT HIGHLIGHTS
Full Rewire Under Pressure
- Over 2,500 metres of cabling installed in 48 hours
- Zero disruption to structural or decorative elements
- All works passed first inspection
13-Camera CCTV Network
- Full PoE system via Cat6
- Strategic camera placement: tills, cellar doors, entry/exit, outdoor tables
- Remote access for owners and licensing compliance



Outdoor Experience Upgrade
- Custom lighting scheme transformed the garden into a premium space
- Weatherproof heating made the area functional year-round
- Boosted seating revenue potential by extending usable hours
The Outcome
Despite impossible odds and almost no lead time, Sonny’s Bar opened on schedule, fully compliant, and better equipped than ever to handle the summer rush.
This project wasn’t just a technical success — it was a testament to what can be achieved with:
- A committed, experienced team
- Round-the-clock effort
- Absolute focus on quality under pressure
Certification Delivered
- Electrical Installation Certificate (EIC)
- Emergency Lighting Certificate
- CCTV Commissioning Report
- Compliance Statement for Licensing Authority
- Operation & Maintenance Manual


Client Feedback
“We genuinely didn’t think it was possible. The guys worked day and night, and the place is unrecognisable. We passed inspection with no notes and were open on Friday as promised. Total lifesavers.”
– Owner, Sonny’s Bar